Raven Rock Machining Thread

Djstorm100

Always have a plan
Vendor
Joined
Dec 17, 2016
Messages
2,164
Location
Raleigh
Rating - 100%
5   0   0
Starts with material on the floor. In 4-6 Weeks the transformation will be complete.

LwxTVuHl.jpg
 
Attaboy
 
Lol thanks guys. Figure it would make it more exciting for y’all to not tell.


The main wall is 30 foot


Sent from my iPhone using Tapatalk
 
Now I'm getting excited........ Milling machines, cutting fluid, welding fumes just like a fine perfume.
 
CFF Escape Room
 
I don’t like how they attached the header. Should have used AL-600 or HEH clips. Also there no permeant shear support. Also the CRC doesn’t look attached. If it’s load bearing make sure they use BC-600’s to clip it.

Paint booth?? Sand blast room?
 
Last edited:
His safe space! You know how these liberals are! :D

It’s my safe room from my wife.

When I say safe, I mean in every sense of whips, chains and leather hanging from the ceiling

I don’t like how they attached the header. Should have used AL-600 or HEH clips. Also there no permeant shear support. Also the CRC doesn’t look attached. If it’s load bearing make sure they use BC-600’s to clip it.

Paint booth?? Sand blast room?

Thanks Mike for looking out
It’s not complete[emoji3]. Rest of material will be in early this week. My great uncle has been doing this longer than I’ve been alive.


Sent from my iPhone using Tapatalk
 
I wanna come push buttons
 
I wanna come push buttons

Wear something cute, then maybe

Getting ISO certified?

Going to be a QA room? I see the wrapped opening so maybe moving in a large laser measuring table?

They have hand held ones i saw at a show this year, think laser scanner, that can measure as high as 0.0002”

I hope your going with LED’s lights instead of Conventional . If not your electrical is gonna catch hell trying to get those 2x4 lights in:)

People still buy conventional lights, for new installs [emoji12]. Yes sir going LED


Sent from my iPhone using Tapatalk
 
I got Pooooweerrrr and air compressor wired up. Should have the air system finished up tomorrow. I hope be fully operational by the end of the month



XZelQ0el.jpg




Gz5jQ5Sl.jpg
 
Last edited:
Back
Top Bottom