Screwed a 58” 2x4 to the wall using 3” screws, 1 into each stud.
Screwed the inline fabrication quick change storage docks to the 2x4 using the supplied hardware.
Feels pretty solid, but with 4 presses on it, and the presses are maybe 6” off the wall because of the design, it does wiggle and I am a little worried about the financial loss if it comes down.
Anyone ever have a problem?
Think I should take down the 2x4 and put up a sheet of plywood?
Screwed the inline fabrication quick change storage docks to the 2x4 using the supplied hardware.
Feels pretty solid, but with 4 presses on it, and the presses are maybe 6” off the wall because of the design, it does wiggle and I am a little worried about the financial loss if it comes down.
Anyone ever have a problem?
Think I should take down the 2x4 and put up a sheet of plywood?